催化燃烧设备主要部件及特点介绍

来源:http://www.yinyehuanbao.com     发布时间:2020-08-20   浏览次数:

催化燃烧除尘器由电子控制柜、净化装置主机和锅炉引风机等主要结构组成。净化装置的主发动机由热交换器、预热室、催化床、防火过滤器和防爆装置组成。
Catalytic combustion dust remover is composed of electronic control cabinet, main engine of purification device and boiler induced draft fan. The main engine of the purification device is composed of heat exchanger, preheating chamber, catalytic bed, fire filter and explosion-proof device.
催化燃烧除尘器的主要组成部件:
The main components of catalytic combustion dust collector are as follows:
一种由多层丝网组成的阻火过滤器,可防止火焰通过并滤除气体中的大量污垢,是净化装置的一种装置。
The utility model relates to a fire-retardant filter composed of multi-layer wire mesh, which can prevent the flame from passing through and filter out a large amount of dirt in the gas.
预热室——使用远红外电热管加热装置,将设备入口温度提升至催化反应所需温度。
Preheating chamber - using far-infrared electric heating tube heating device to raise the equipment inlet temperature to the temperature required for catalytic reaction.
耐热性-使用镍-铬钢带不锈钢保护管热阻;
Heat resistance - use Ni Cr steel with stainless steel protection tube thermal resistance;
催化床-是催化净化设备的核心装置,由多层蜂窝组成。
Catalytic bed is the core device of catalytic purification equipment, which is composed of multi-layer honeycomb.
防爆装置-弹簧卸压装置,当设备运行发生事故时,可及时减压,防止事故发生;
Explosion proof device spring pressure relief device, when the equipment operation accident, can timely reduce pressure to prevent accidents;
催化燃烧设备
风机—采用前送风锅炉引风机,使设备在正压下工作。
Fan - the front air supply boiler induced draft fan is used to make the equipment work under positive pressure.
阀门——控制、调节气体流量大小。
Valve - control and adjust gas flow.
催化燃烧除尘器工作过程及原理:
Working process and principle of catalytic combustion dust collector:
启动后,设备按照程序对催化剂进行清洗,然后通过电加热器加热催化剂。当电加热器达到设定的预热温度时,主入口阀首先打开。当催化剂达到催化着火温度(一般为200-300摄氏度),随着反应热和电加热器的不断产生。通过加热,预热后的空气温度逐渐达到设计的催化点火温度。电加热是一种分组加热方式,有两组,系统可以根据废气浓度在两组间切换。当废气浓度达到一定值时,系统停止加热回复正常运行状态。
After start-up, the equipment cleans the catalyst according to the procedure, and then heats the catalyst by electric heater. When the electric heater reaches the preset preheating temperature, the main inlet valve is opened first. When the catalyst reaches the catalytic ignition temperature (generally 200-300 ℃), with the reaction heat and electric heater continuously generated. By heating, the air temperature after preheating gradually reaches the designed catalytic ignition temperature. Electric heating is a group heating mode, there are two groups, the system can switch between the two groups according to the concentration of exhaust gas. When the concentration of waste gas reaches a certain value, the system stops heating and returns to normal operation.
当废气浓度过高引起设备内温度大于450摄氏度时,新风阀开启,稀释废气浓度,保持设备正常运行。当废气浓度较低时,系统将无法通过废气的反应热保持热平衡。此时需要加热,即一到两组加热。以上是自动设备运行过程。
When the temperature in the equipment is higher than 450 ℃ due to the high concentration of exhaust gas, the fresh air valve will be opened to dilute the concentration of exhaust gas and maintain the normal operation of the equipment. When the concentration of waste gas is low, the system will not be able to maintain heat balance through the reaction heat of waste gas. At this point, heating is required, i.e. one to two groups of heating. The above is the operation process of automatic equipment.